Loading…
Velaxe
ProjectBoard — Structured Project Catalogue, Media, Updates, Public Pages & Engagement Analytics | Velaxe

ProjectBoard

Schedule project updates for automatic publishing

Place a completed update into the publishing queue and let the scheduled worker publish it at the configured time.

12 min Beginner Project Manager, Operations Updated Aug 23, 2026

Overview

Place a completed update into the publishing queue and let the scheduled worker publish it at the configured time.

Prerequisites

  • publishing.manage permission
  • Scheduled publishing enabled in ProjectBoard settings

Permissions required

updates.manage publishing.view publishing.manage

Steps (4)

Estimated: 12 min
  1. 1

    Create the update

    Project Manager 4 min Back to top

    Prepare the project update, attachments, visibility and notification policy.

    Tips

    —

    Validation

    —

    Success criteria

    —

  2. 2

    Set the publishing time

    Project Manager 3 min Back to top

    Choose a future publish_at value and save the update as Scheduled.

    Tips

    —

    Validation

    • The update status is Scheduled and the queue records its due time.

    Success criteria

    —

  3. 3

    Review the Publish Queue

    Operations 2 min Back to top

    Open Publishing → Publish Queue to review queued, running, completed and failed publishing work.

    Tips

    —

    Validation

    —

    Success criteria

    —

  4. 4

    Confirm automatic publication

    Operations 3 min Back to top

    At the due time, the publish-scheduled-updates worker publishes the update, registers its route and emits the publish event.

    Tips

    —

    Validation

    —

    Success criteria

    • The update becomes Published and the queue records completion.

About this guide

ProjectBoard gives each workspace a structured source of truth for project content. Create project records with categories, locations, dates, visibility, type-specific attributes, cover media, galleries and supporting files.

Create rich project updates with summaries, categories, period tags, attachments and visibility controls. Publish immediately or schedule updates through the built-in publishing queue, then present published content through configurable public update pages with versioned templates.

ProjectBoard includes project and update analytics, activity history, media management, integration administration, Bridge credentials, ContextResolver capabilities and event publication. Authorized workspace apps can consume canonical project and update operations through Handler or RCP, while external systems can use Velaxe HMAC Bridge v2 with operation, IP, replay, timestamp and rate controls.